Wow, a lot has changed since the last visit. We've been twice in quick succession, but first I'll try a picture as the last time I tried it failed to insert it! Here goes:
So you can see the wheelhouse is now in place and the steel is painted shiny Flag Blue, just awaiting a white line above the rubbing strip. This was how it looked yesterday (Monday 25th June) when we visited; we went to meet the signwriter, to ask him to make it like Marius's design (font and letter A). I'd attach his Photoshop image (which looks lovely) but it's a bit large and might just not load! The deck is blue now, but it will be done in non-slip grey. The oak floor in the wheelhouse is good, so we have to keep it that way. I'll post this now, but just add a picture of the inside of the wheelhouse, from the outside!
Tuesday, 26 June 2012
Thursday, 14 June 2012
Our visit on 13th June to view Archangel was also to bring up the bathroom flooring, and the sound & TV system for installation; these last helped clear a little bit of space in our crowded and confused house! We were again very pleased with the lovely work they have done to realise our dream. The pictures a bit messy because of lighting (big fluorescent tubes!) and all the parts, wires, etc., but I hope you can see through that to the beautiful interior emerging:
The portholes are not in place yet, but just look at the lovely wood colour and how it goes with the white panelling! It keeps looking better. This is our bedroom; the other way is a bit less tidy and I had to put my hand in the way of the light tube!
The saloon is harder to see, but the view from the side-cabin gives an idea of how much move feeling of space is given by Tad's idea of opening it up into the saloon-galley:
and the view the other way, from the galley, is a bit better, showing two of the bookcases in place (but awaiting doors):
The engine and generator are now in place, which is comforting!:
The outside is similar to before, with a bit of wood inside it; the hinges for the fold-down wooden wheelhouse are there. They have fitted it apparently, but keeping it apart keeps it from harm while there are so many trades on the boat in the last minute rush. It is supposed to launch at Caversham on Independence Day, 4th July, assuming all is done. We have to inspect it before and are supposed even to spend a weekend 'aboard' in the boatbuilders back yard (not on water) which would be very odd. That way they can deal with all the snagging issues in their workshop rather than a long way off! Good idea when you put it like that. Watch this space!
The portholes are not in place yet, but just look at the lovely wood colour and how it goes with the white panelling! It keeps looking better. This is our bedroom; the other way is a bit less tidy and I had to put my hand in the way of the light tube!
The saloon is harder to see, but the view from the side-cabin gives an idea of how much move feeling of space is given by Tad's idea of opening it up into the saloon-galley:
and the view the other way, from the galley, is a bit better, showing two of the bookcases in place (but awaiting doors):
The engine and generator are now in place, which is comforting!:
The outside is similar to before, with a bit of wood inside it; the hinges for the fold-down wooden wheelhouse are there. They have fitted it apparently, but keeping it apart keeps it from harm while there are so many trades on the boat in the last minute rush. It is supposed to launch at Caversham on Independence Day, 4th July, assuming all is done. We have to inspect it before and are supposed even to spend a weekend 'aboard' in the boatbuilders back yard (not on water) which would be very odd. That way they can deal with all the snagging issues in their workshop rather than a long way off! Good idea when you put it like that. Watch this space!
Monday, 11 June 2012
Our next visit was on 29th May, as the builder needed the wall lights we'd bought. The inside has advanced, as you can see:
Not very sharp, but you can see the bookcase they've nicely built above the steel oil tank; it will have nice doors on it later. Then here's some work done on the seating which pulls out to make the side cabin's double bed.
Not very sharp, but you can see the bookcase they've nicely built above the steel oil tank; it will have nice doors on it later. Then here's some work done on the seating which pulls out to make the side cabin's double bed.
The engine is not installed yet so not a lot more to see of interest to publish; we took lots of pictures of engineering details like the bow thruster and cupboards.
We visited the boatbuilder on 14th May to view progress; the outside looks similar but a lot has changed inside, as you can see:
We really like the wood grain and colour; the little nook in the corner is our bijou wet-room (shower, sink, loo!) Then there's lounge, sorry Saloon:
I'm at the end of the corridor leading to the bedroom, passing the main bathroom on the right. The big opening on the left is into the Side-Cabin which will have folding doors so they can be opened when no-one's using it as a second bedroom, so it can be used as living space. Nice idea from Tad. The big white-edged pink thing to my left is the diesel tank for our coal-effect fire/stove. I should mention that our portholes are not really made of paper! Then behind the camera is the next view:
So we have stairs from the Wheelhouse, then on the right is the space for the fridge-freezer with a microwave on top, eventually. I looked for the engine in the engine room, but found it at the front, in its box:
We really like the wood grain and colour; the little nook in the corner is our bijou wet-room (shower, sink, loo!) Then there's lounge, sorry Saloon:
I'm at the end of the corridor leading to the bedroom, passing the main bathroom on the right. The big opening on the left is into the Side-Cabin which will have folding doors so they can be opened when no-one's using it as a second bedroom, so it can be used as living space. Nice idea from Tad. The big white-edged pink thing to my left is the diesel tank for our coal-effect fire/stove. I should mention that our portholes are not really made of paper! Then behind the camera is the next view:
So we have stairs from the Wheelhouse, then on the right is the space for the fridge-freezer with a microwave on top, eventually. I looked for the engine in the engine room, but found it at the front, in its box:
Thursday, 19 April 2012
Just a couple more pix, because (I suppose I should be pleased) I just found that some pix Nik took on her less fancy camera are rather better than mine, bother!
So here they are without any commentary (you'll be pleased to know!):
Tho' I should point out the trapdoor in the "driver's position" in case the helmsman does anything stupid. I actually think it's what they drop the engine through, and remove it if it doesn't work.
Yes, that distant figure is me, amazing how the lens distorts.
So here they are without any commentary (you'll be pleased to know!):
Tho' I should point out the trapdoor in the "driver's position" in case the helmsman does anything stupid. I actually think it's what they drop the engine through, and remove it if it doesn't work.
Yes, that distant figure is me, amazing how the lens distorts.
Another month, another visit. We would have gone sooner but finishing the re-wiring, moving piles for different destinations about the house and from garage to garage, and starting gas safety all took lots of time and effort! Also our builder was on shut-down for the Bank Holiday week. So we went up on Wednesday 18th April to see Archangel for the first time in her primer coat and sited in the Woodworking shed. The pix won't be much different to those before, but WE took them, so we're there for scale. And a few more. So here's how she looked to us. The boat wasn't moving (it's pretty crisp) so I guess Nik was just moving due to sea legs (we'd did our VHF course on Sunday to allow us to legally operate our ship's radio, and the course is on the floating barge of Commodore Yachting at Gosport). Then another view
Then for those of you interested in details, here is the back end showing the big steel platey thing meant to help us steer it:
You may just notice that there's something missing, the finny thing that goes round & round. Well that's because the big noisy thing that eats diesel isn't there yet, and that's a whole new stage. I can prove it's not there:
See! That's where I think it goes, and we can see the place they keep the weed (the "Weed Hatch") at the end, the oblong box, tho' why we'd want weed in a box I don't know. Nice and clean and lots of space, but this area will be pretty full by the end, but still very neat and accessible. I've not been down there yet, I just risked losing my glasses by leaning over, then point & shoot!
Just in case I was looking the wrong place, I checked the other half too:
Not there! I expect you're wondering what's that thing half way down on the right? Yes? Me too. I only just noticed it. It seems to be about where the wall separating the loo and the saloon is. Ah, I have it, this must be the steel tank for holding the diesel used in the diesel stove. So the stove sits this side, and the loo in the main bathroom goes the other. That's cosy, just as well diesel isn't explosive (i.e. backing onto a Thunderbox). Now in case you were thinking this is really quite a small boat (which in many ways it is) here's a rubbish view from the bow; it's rubbish because I was balancing and nearly fell off taking it!
You're looking over our bedroom, with the first 'hole' being the skylight (Houdini hatch) lighting the corridor, then the big hole being the pigeon box over the saloon, and the next small hole being the skylight over the galley. The last big hole is where the wooden superstructure of the wheelhouse will be built, and where we'll probably spend most of our time.
What should follow now is a picture of the really beautiful and yet brand new bronze portholes from Trinity Marine, but guess what? I forgot to take a picture, so next time I will. So we spent most of the day going over most of the internal design details with Mark, who's in charge of all that; he now has Marius's photoshop imagination-led impression of what we'd like, and we've agreed to pay a bit more for some more panelling on the end wall of the saloon, to make it complete. Lots still to decide, and we dropped into a nearby supplier and picked the materials for the seat cushions in the wheelhouse and in the Side Cabin (small bedroom). Well, until next time....
Here you see a high-lift forklift loaded with a lot of bricks they'll use as ballast. They started unloading these on the afternoon we were there. That task and adding all the spray foam insulation are next on their list. Then a view from the highest woodworking platform, which makes her look quite small:
You may just notice that there's something missing, the finny thing that goes round & round. Well that's because the big noisy thing that eats diesel isn't there yet, and that's a whole new stage. I can prove it's not there:
See! That's where I think it goes, and we can see the place they keep the weed (the "Weed Hatch") at the end, the oblong box, tho' why we'd want weed in a box I don't know. Nice and clean and lots of space, but this area will be pretty full by the end, but still very neat and accessible. I've not been down there yet, I just risked losing my glasses by leaning over, then point & shoot!
Just in case I was looking the wrong place, I checked the other half too:
Not there! I expect you're wondering what's that thing half way down on the right? Yes? Me too. I only just noticed it. It seems to be about where the wall separating the loo and the saloon is. Ah, I have it, this must be the steel tank for holding the diesel used in the diesel stove. So the stove sits this side, and the loo in the main bathroom goes the other. That's cosy, just as well diesel isn't explosive (i.e. backing onto a Thunderbox). Now in case you were thinking this is really quite a small boat (which in many ways it is) here's a rubbish view from the bow; it's rubbish because I was balancing and nearly fell off taking it!
You're looking over our bedroom, with the first 'hole' being the skylight (Houdini hatch) lighting the corridor, then the big hole being the pigeon box over the saloon, and the next small hole being the skylight over the galley. The last big hole is where the wooden superstructure of the wheelhouse will be built, and where we'll probably spend most of our time.
What should follow now is a picture of the really beautiful and yet brand new bronze portholes from Trinity Marine, but guess what? I forgot to take a picture, so next time I will. So we spent most of the day going over most of the internal design details with Mark, who's in charge of all that; he now has Marius's photoshop imagination-led impression of what we'd like, and we've agreed to pay a bit more for some more panelling on the end wall of the saloon, to make it complete. Lots still to decide, and we dropped into a nearby supplier and picked the materials for the seat cushions in the wheelhouse and in the Side Cabin (small bedroom). Well, until next time....
Thursday, 5 April 2012
Well, I'm well behind on my entries, and now I've a 'work-around' the software problem. We've made lots of visits so there'll be lots of pictures, too many really so skip to the best ones, but this is meant as a record of the major changes! For example, on 19th March we visited and found a much more complete shell:
Although if you magnify it you'll see the joins are just tacked, so it'd be pretty leaky! This probably the most impressive end, but here are some more from the next visit, when they'd put on enough deck for us to stand on (the time before they had to take the pictures from bits of steel because "they were insured" !:
Then here's one Nicola took of me for scale; I include it although it's out of focus, or maybe the World moved a bit when the shutter went?:
Here are some images of a similar boat, that sat alongside Archangel on that day, of what she'd have looked like even before the first pix we received from them. It's a bit like a herring after you've eaten the flesh!:
Then here's a view looking along the top of Archangel from the stern deck. The up-stand in the foreground is the steel, lower half of the wheelhouse (the rest is in hardwood):
At this visit we learned that the builder urgently needed at least samples of each size of porthole so they could cut the right size holes in the side of the cabin walls (to the right above, standing up from the deck). So I contacted Trinity Marine, the excellent Aladin's cave of all things maritine; they have lovely portholes of all varieties and we'd visited them September 2011 to look for all things that might suit the barge. We found a wonderful spinning porthole, complex and so clever; rather expensive for the whole boat, and in the end too large for where we wanted to put them. So we went for some reclaimed ones, with 2 locking screws. When we discussed these with the builder he preferred a similar one but with 4 locking screws. Not important unless you have to open and lock them every day (which we wouldn't of course)! Anyway they looked lovely too, so I called Trinity to arrange delivery of one 16" inch diameter and one 14", which arrived the Friday after our visit of the Wednesday. They looked great, and were in even better (e.g. shinier) condition than the ones we'd originally chosen. So we visited to see the boat now with some holes cut in to take three of the larger ones:
I then had a meeting to further discuss, this time with their head welder, how to attach these and make sure they don't leak. There was a concern because, being old, they weren't quite round (about 5-10 mm out of circular) which makes the engineering and fit difficult. We came to a kind of compromise solution, which I was content with. Later that day we heard that the boss felt that a different porthole again would be better, and fit better with their excellent reputation for quality; we're now going from a reclaimed brass porthole (as used on the Queen Mary) to a newly made bronze porthole from Trinity (bronze is a bit better for marine use) that is fully CE marked, made using the old casting process and design. It will be more precise, have brand new seals, and looks very pretty indeed. It's back to two screws as well, so a further bonus! You can see them on the Trinity Marine website, well not ours, they're already delivered to the boat builder, and all the holes cut. The only other difference, which you'll probably see on the pictures below, is that the smaller portholes are 12" instead of 14"; these are the three towards the bow, for the bedrooms and bathrooms. So here it is "on the move" from the welding shed into the woodworking shed - quite a transformation:
Amazing (or are we biase?) ! This is with the primer coats on; there are undercoats and all sorts to go on, near the end. Bear in mind these are of a boat at the end of March, which was nothing in January except some steel sheets and bar, and in February would have looked like this (another one in build):
We're not visiting for a little while, Easter and all, but next time it will have the foam insulation added on the inside of the boat, and soon after will have an engine and the bits to drive it. It already has two huge liquid tanks welded into the base, one for diesel and one for waste water. And it'll have added that most boring but necessary of things, ballast!
Although if you magnify it you'll see the joins are just tacked, so it'd be pretty leaky! This probably the most impressive end, but here are some more from the next visit, when they'd put on enough deck for us to stand on (the time before they had to take the pictures from bits of steel because "they were insured" !:
Then here's one Nicola took of me for scale; I include it although it's out of focus, or maybe the World moved a bit when the shutter went?:
Here are some images of a similar boat, that sat alongside Archangel on that day, of what she'd have looked like even before the first pix we received from them. It's a bit like a herring after you've eaten the flesh!:
Then here's a view looking along the top of Archangel from the stern deck. The up-stand in the foreground is the steel, lower half of the wheelhouse (the rest is in hardwood):
At this visit we learned that the builder urgently needed at least samples of each size of porthole so they could cut the right size holes in the side of the cabin walls (to the right above, standing up from the deck). So I contacted Trinity Marine, the excellent Aladin's cave of all things maritine; they have lovely portholes of all varieties and we'd visited them September 2011 to look for all things that might suit the barge. We found a wonderful spinning porthole, complex and so clever; rather expensive for the whole boat, and in the end too large for where we wanted to put them. So we went for some reclaimed ones, with 2 locking screws. When we discussed these with the builder he preferred a similar one but with 4 locking screws. Not important unless you have to open and lock them every day (which we wouldn't of course)! Anyway they looked lovely too, so I called Trinity to arrange delivery of one 16" inch diameter and one 14", which arrived the Friday after our visit of the Wednesday. They looked great, and were in even better (e.g. shinier) condition than the ones we'd originally chosen. So we visited to see the boat now with some holes cut in to take three of the larger ones:
I then had a meeting to further discuss, this time with their head welder, how to attach these and make sure they don't leak. There was a concern because, being old, they weren't quite round (about 5-10 mm out of circular) which makes the engineering and fit difficult. We came to a kind of compromise solution, which I was content with. Later that day we heard that the boss felt that a different porthole again would be better, and fit better with their excellent reputation for quality; we're now going from a reclaimed brass porthole (as used on the Queen Mary) to a newly made bronze porthole from Trinity (bronze is a bit better for marine use) that is fully CE marked, made using the old casting process and design. It will be more precise, have brand new seals, and looks very pretty indeed. It's back to two screws as well, so a further bonus! You can see them on the Trinity Marine website, well not ours, they're already delivered to the boat builder, and all the holes cut. The only other difference, which you'll probably see on the pictures below, is that the smaller portholes are 12" instead of 14"; these are the three towards the bow, for the bedrooms and bathrooms. So here it is "on the move" from the welding shed into the woodworking shed - quite a transformation:
Amazing (or are we biase?) ! This is with the primer coats on; there are undercoats and all sorts to go on, near the end. Bear in mind these are of a boat at the end of March, which was nothing in January except some steel sheets and bar, and in February would have looked like this (another one in build):
We're not visiting for a little while, Easter and all, but next time it will have the foam insulation added on the inside of the boat, and soon after will have an engine and the bits to drive it. It already has two huge liquid tanks welded into the base, one for diesel and one for waste water. And it'll have added that most boring but necessary of things, ballast!
Subscribe to:
Posts (Atom)